Water & Sewer Rates
Water Usage Residential |
Fee |
First 2000 gallons (minimum fee) |
$25.00 |
Next 3000 gallons |
$2.40/1000 gallons |
Next 5000 gallons |
$2.10/1000 gallons |
Over 10,000 gallons |
$1.50/1000 gallons |
Water Usage Commercial |
Fee |
First 10,000 gallons (minimum fee) |
$65.00 |
Each 1,000 gallons |
$4.00/1000 gallons |
Sewer Usage |
Rate |
First 2000 gallons (minimum fee) |
$13.80 |
Next 2500 gallons |
$3.90/1000 gallons |
Next 2500 gallons |
Over 4500 gallons |
Fees
Item |
Fee |
Reconnection Fee |
$35.00 |
Connection Deposit |
$150.00 |
Meter Reread |
$25.00 |
Short Tap |
$1,250 |
Long Tap |
$2,750 |
Water Availability |
$1,500 |
Sewer Availability |
$1,500 |
For new subdivision construction, water and sewer taps are provided and funded by the developer per the Town of Triana Subdivision regulations. The availability fees ($3000 per lot) are paid by the developer up front for the entire phase at time the Final Plat is signed prior to issuance of the first construction permit by the builders. Builders may contact Town Hall to request meters as needed, however, due to supply and labor constraints it is recommended that builders call for meter at permit issuance. Builders are responsible to keep meter boxes clean and free of debris once the meter has been called for. Meter boxes that are missing or full of debris may be subject to installation delays and additional fees.
For new construction or mobile/manufactured homes without an existing meter, tap fees may apply in addition to the water/sewer availability fees. If the water main is located on the same side of the street as the residence, a short tap fee will apply. If the water main is located on the opposite side of the street, a long tap (under the road) fee will apply. The location of the fire hydrants may identify which side of the street has the water main.